55 t/day Municipal-Sludge Composting Facility

Case Study | DAYI COUNTY, CHENGDU, SICHUAN

1 . Project Background

Dayi County has intensified rural and urban sanitation upgrades in recent years. With wastewater-plant throughput climbing, more than 50 t of dewatered sludge were produced daily—high moisture, pathogens, odour. To hit the “reduction, detoxification, and recycling” targets set by the local ECO Bureau, the county launched a sludge-composting initiative.

2 . Jiesonglin Solution

In H1 2024 the county government teamed with a local environmental firm to deploy nine 300 m³ e-PTFE membrane composters from Jiesonglin Technology, creating a centralised sludge-fermentation park:

  1. Blend sludge with straw and rice husks to adjust C/N ratio
  2. Load mixture via wheel loader into compost cells
  3. Cover piles with high-permeability nanomembrane
  4. Run sealed, high-temperature aerobic fermentation (auto temp & humidity control)
  5. Capture & treat leachate in closed system

3 . Quantifiable Results

MetricValue
Sludge processed daily≈55 t
Composting cycle≈25 days
Cost saving vs. drying + incineration≈35 %
Final productStable soil conditioner for farmland, nurseries, eco-restoration
Nuisance odour / flies> 90 % reduction
CompliancePassed provincial environmental acceptance

4 . Government Testimonial

“The membrane-composting project not only solved our sludge bottleneck but also set a benchmark for Dayi’s green transition. The technology is stable, easy to maintain, and ready for rollout across more townships.”
— Director, Dayi County Housing & Urban-Rural Development Bureau

Facebook
X
LinkedIn
Pinterest

Leave a Reply

Your email address will not be published. Required fields are marked *

Get in touch with us
Latest posts
What they say
Talk to our experts
Please enable JavaScript in your browser to complete this form.
Once we receive your message, we will contact you as soon as possible

Nullam quis risus eget urna mollis ornare vel eu leo. Aenean lacinia bibendum nulla sed